RBA Start-up Mission for the Upper Dnieper Pilot Basin, Belarus, Nov 2012

Objective of the mission was to support the local CWME and RBA implementation team for the startup of the Phase 1 of the study; to evaluate the level of existing information for the River Basin Analysis (RBA), discuss cooperation with the local institutions and on-going water related activities in Belarus.

Country: 

Project Activity: 

River Basin: 

November 14, 2012 to November 15, 2012

Downloads type: 

  • Mission reports